Complementary Infrastructure

Complementary Infrastructure

Pier
Antón Lizardo, VER

  • Docking bay for coastal patrols
  • 4 docking positions of 165 m
  • Dock for MLB patrols and interceptors
  • Floating dock with 33 berths

2016

6 months duration
Marine Terminal Pier (2nd. Docking Position)

Marine Terminal Pier (2nd. Docking Position)

Marine Terminal Pier
Manzanillo, COL

  • 250 m long marginal spring
  • 2a. docking position
  • 654 concrete piles 60 m x 60 m, 32.60 m long

2020

In process
Complementary Works Aviation School

Complementary Works Aviation School

Auditorium
La Paz, BCS

  • 11 simultaneous constructions, roads and room of spaces
  • Training pit (capacity 4.5 million l)
  • Auditorium (capacity 263 people)
  • Coexistence centre (capacity 200 people)
  • Gym

2017

6 months duration
Asphalt Landing Strip

Asphalt Landing Strip

Aerial View
Santa Margarita Island, BCS

  • Land improvement
  • Capillary breaking layer, base and sub-base
  • 9cm thick asphalt folder and marginal protection

2016

7 month duration
Wet Sea Breakwater

Wet Sea Breakwater

Antón Lizardo Breakwater
Antón Lizardo, VER

  • 760,000 tons of pyramid-shaped rock
  • Tarquina for wet marine dredging
  • Marginal spring

2016

6 months duration
Dock Replacement

Dock Replacement

Acapulco Pier
Acapulco, GUE

  • Demolition of existing dock due to structural failure
  • Foundation based on 211 piles with earthquake protection
  • Reinforced concrete superstructure, slabs, screens and heads

2018

6 months duration